...
【24h】

Tower Fabrication Delivered For Santos Basin Lay System

机译:为Santos盆地铺设系统交付的塔架制造

获取原文
获取原文并翻译 | 示例

摘要

IHC Engineering Business (IHC EB), based in Stocksfield, England, has reached a pivotal point in the construction of a 300-tonne capacity flexible pipe-lay system destined for the Santos basin deep waters off the Brazilian coast. A key stage of the project has been achieved with the delivery of the 150-tonne tower fabrication, one of the key structures of the system, to IHC EB's Port of Tyne facility ahead of a six-month outfitting and testing period.
机译:总部位于英国斯托克斯菲尔德的IHC工程业务部(IHC EB)已达到了建设300吨产能的挠性管道铺设系统的关键点,该系统将运往巴西沿海桑托斯盆地深水区。该项目的关键阶段已经完成,在六个月的整装和测试期之前,将150吨的塔架结构(系统的关键结构之一)交付给IHC EB的泰恩港设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号