首页> 外文期刊>SBB Steel Markets Daily >Brazil's Vale to idle two pellet plants
【24h】

Brazil's Vale to idle two pellet plants

机译:巴西淡水河谷闲置两座颗粒厂

获取原文
获取原文并翻译 | 示例
           

摘要

Brazil's Vale said Thursday it will temporarily idle the Sao Luis and Tubarao I and II iron ore pellet plants, starting October 8 at Sao Luis and November 13 at Tubarao, on weaker demand from steelmakers. Vale will boost supply of sinter feed instead as it reduces iron ore supplied to pellet plants, the Rio de Janeiro-based group said in a statement. Sao Luis and Tubarao I and II produced 4.93 million mt of pellets during the first half of 2012, accounting for 18.3% of Vale's total, it said.
机译:巴西淡水河谷周四表示,由于钢铁制造商的需求减弱,巴西圣路易斯和图巴朗I和Tubarao I和II铁矿石球团矿厂将从10月8日在圣路易斯开始,11月13日在Tubarao暂时停产。总部位于里约热内卢的集团称,淡水河谷将增加烧结矿的供应量,因为它将减少供应给颗粒厂的铁矿石。该公司表示,2012年上半年,圣路易斯和图巴朗一世及二世生产了493万吨颗粒,占淡水河谷总产量的18.3%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号