首页> 外文期刊>SBB Steel Markets Daily >Kumba Q3 iron ore output up 14% on Kolomela ramp-up
【24h】

Kumba Q3 iron ore output up 14% on Kolomela ramp-up

机译:昆巴第三季度铁矿石产量增加14%

获取原文
获取原文并翻译 | 示例
           

摘要

Anglo American subsidiary Kumba Iron Ore said Thursday that output in the third quarter rose 14% year on year to a record 12.5 million mt as production at its Kolomela mine ramped up faster than expected. Kumba said the Kolomela mine in South Africa is expected to produce at least 7 million mt of iron ore in in 2012. However, production at the Sishen mine was down 7% at 9.8 million mt, “as mining feedstock and quality constraints continued to impact plant throughput.”
机译:英美资源集团的子公司库姆巴铁矿石周四表示,由于Kolomela矿山的产量增长快于预期,第三季度产量同比增长14%,达到创纪录的1,250万吨。 Kumba说,南非的Kolomela矿预计在2012年生产至少700万吨铁矿石。然而,Sishen矿的产量下降7%,至980万吨,“由于采矿原料和质量限制继续影响工厂产能。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号