首页> 外文期刊>SBB Steel Markets Daily >Vale's 9 billion dollars in steel projects survive rough water
【24h】

Vale's 9 billion dollars in steel projects survive rough water

机译:淡水河谷的90亿美元钢铁项目幸免于难

获取原文
获取原文并翻译 | 示例
           

摘要

Despite delays and reversals, the steel projects of Brazilian mining giant Vale are still a reality, Platts Steel Business Briefing learned from the company's steel director, Aristides Corbellini. The miner plans direct investment of 9 billion dollars for the establishment of the three units: Companhia Siderúrgica de Ubu (CSU), in the southeast state of Espírito Santo; Acos Laminados do Para (Alpa), in the northeast state of Pará, and Companhia Siderúrgica do Pecém (CSP) in Ceara state.
机译:普氏SBB从该公司钢铁主管阿里斯蒂德斯·科贝里尼(Aristides Corbellini)获悉,尽管存在延误和逆转,但巴西矿业巨头淡水河谷的钢铁项目仍然是现实。该矿商计划直接投资90亿美元,以建立三个子公司:位于东南部的EspíritoSanto的CompanhiaSiderúrgicade Ubu(CSU);东北帕拉州的Acos Laminados do Para(Alpa)和塞阿拉州的CompanhiaSiderúrgicadoPecém(CSP)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号