【24h】

Power trip

机译:断电

获取原文
获取原文并翻译 | 示例
       

摘要

When electricity prices plunged in 2002, rather than exit from small-scale distributed generation (dg), efficient energy resources ltd. decided that opportunity was knocking.however, opening the door required quickly adjusting the business plan the calgary firm had drawn up less than two years earlier. that plan called for producing electricity using small, distributed generators powered by gas at stranded remote or low-producing gas wells.
机译:2002年电价暴跌,而不是退出小型分布式发电(dg),高效能源有限公司。但是,打开门需要迅速调整卡尔加里公司不到两年前草拟的商业计划。该计划要求使用绞合的偏远或低产气井中的天然气供电的小型分布式发电机发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号