首页> 外文期刊>Oil Asia >NLC Optimistic Of Increase in Power Generation and Lignite Mining by the End of 12th Plan
【24h】

NLC Optimistic Of Increase in Power Generation and Lignite Mining by the End of 12th Plan

机译:NLC的“十二五”末发电量和褐煤开采量增长前景乐观

获取原文
获取原文并翻译 | 示例
           

摘要

BSurender Mohan, Chairman and Managing Director Neyveli Lignite Corporation (NLC), said 22nd May, that power generation and lignite mining capacity would increase before March 2017, the end of the current 12th Five Year Plan. He said that after completing ongoing 7 projects of 500 MW thermal expansion unit 11, 1,000 MW Tuticorin project, renewable energy projects like solar 10 MW project and wind farm project of 50 MW, power generating capacity will be increase from 2,740 MW to 4,240 MW.
机译:Neyveli Lignite Corporation(NLC)董事长兼董事总经理BSurender Mohan表示,5月22日,发电和褐煤开采能力将在当前的第十二个五年计划结束的2017年3月之前增加。他说,在完成了正在进行的7个项目(500兆瓦热膨胀机组11、1,000兆瓦杜蒂戈林项目),可再生能源项目(如太阳能10兆瓦项目和50兆瓦风电场项目)后,发电能力将从2,740兆瓦增加到4,240兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号