首页> 外文期刊>Oil and Gas Journal >DNO prepares to start oil production in Iraq
【24h】

DNO prepares to start oil production in Iraq

机译:DNO准备开始在伊拉克生产石油

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

DNO ASA,Oslo,is planning early production,possibly in first quarter 2007,from Tawke oil field in the northern Kurdish region of Iraq based on test results from the discovery well and an appraisal well.DNO achieved a maximum flow rate of 5,000 b/d of oil during open-hole tests ofTawke-2A,a twin well 20 km from the Tawke-1 discovery well.Tawke-1 also flowed at 5,000 b/d on test(OGJ Online,June 19,2006,Newsletter).This well penetrated two reservoir zones exceeding 2,000 m deep,which were preserved behind casing and will be tested later.
机译:奥斯陆DNO ASA计划根据发现井和评估井的测试结果,计划于2007年第一季度从伊拉克北部库尔德地区的Tawke油田开始早期生产。DNO的最大流量为5,000 b /在距Tawke-1发现井20公里的双井Tawke-2A裸眼测试中,油的d.Tawke-1也在测试中以5,000 b / d的流量流动(OGJ Online,2006年6月19日,新闻通讯)。井穿透了两个深度超过2,000 m的储层,这些储层被保存在套管后面,稍后将进行测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号