...
首页> 外文期刊>Oil & Gas Eurasia >LUKOIL Completes Construction of the Main Production Facility at Yu. Korchagin Field
【24h】

LUKOIL Completes Construction of the Main Production Facility at Yu. Korchagin Field

机译:卢克石油公司(LUKOIL)完成了位于Yu的主要生产设施的建设。科尔恰金球场

获取原文
获取原文并翻译 | 示例

摘要

A 74.2-meter bridge uniting two offshore ice-resistant fixed platforms into one complex has been assembled at Yu. Korchagin field located in the Caspian Sea.On August 16, the main production facility - offshore platform for drilling, oil and gas treatment and transportation - was assembled at the fixed location. The facility's azimuth shift came to plus 0.2 degrees, horizontal shift - plus 0.2 meters, while the inclination is 0 degrees. This is very high accuracy for an offshore facility weighing about 25,000 tons.
机译:于已组装了一座74.2米的桥,它将两个海上抗冰固定平台组合成一个综合体。位于里海的Korchagin油田.8月16日,主要生产设施-钻井,油气处理和运输的海上平台-在固定位置组装。设施的方位角偏移加0.2度,水平偏移-加0.2米,而倾斜度为0度。对于重达25,000吨的海上设施来说,这是非常高的精度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号