首页> 外文期刊>Oil and Gas Investor >Infrastructure Needs Follow Fast-paced Marcel I us Activity
【24h】

Infrastructure Needs Follow Fast-paced Marcel I us Activity

机译:基础设施需求紧跟快节奏的Marcel I us活动

获取原文
获取原文并翻译 | 示例
           

摘要

Marcellus gas development has proceeded at full throttle, and a variety of midstream infrastructure needs are following closely behind. However, very recent environmental policy changes in Pennsylvania involving water handling and treatment, the possibility of a production tax in the state, and potential new regulations related to hydraulic fracturing may slow the torrid pace of area resource development. Also, with New York state regulators seeking to reach a final policy decision related to restoration of ongoing regional development, uncertainty and timing remain there as well.
机译:马赛勒斯(Marcellus)天然气的开发已全面展开,各种中游基础设施需求紧随其后。但是,宾夕法尼亚州最近的环境政策变化涉及水处理和处理,该州可能征收生产税以及与水力压裂有关的潜在新法规,可能会减缓该地区资源开发的艰巨步伐。此外,随着纽约州监管机构寻求就恢复正在进行的地区发展做出最终政策决定,不确定性和时机也依然存在。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号