首页> 外文期刊>Oil & Gas Eurasia >'Berkut' Rig to Start Operation for Sakhalin-1
【24h】

'Berkut' Rig to Start Operation for Sakhalin-1

机译:“ Berkut”钻机开始为萨哈林一号投入运营

获取原文
获取原文并翻译 | 示例
           

摘要

Exxon Neftegaz, the operator of Sakhalin-1 project, went public about completion of the gravity base for Berkut rig. After installation of the oversea substructure the rig, by then the largest in Russia, will begin producing oil at the Arkutun-Dagi field. ExxonMobil and Rosneft, members of the project, are to build dozens more of such platforms.In late May, gravity-base substructure (GBS) for Arkutun-Dagi field (Sakhalin-1 project) has been completed in dry dock of the Vostochny port in Primorsky Krai territory. Norwegian company Kvaerner worked on the base's design and construction for two years. This mighty construct is a 160,000 ton rectangle with four silos, vaguely reminiscent of the "upside-down elephant".
机译:Sakhalin-1项目的运营商埃克森·内夫塔兹(Exxon Neftegaz)公开宣布Berkut钻机的重力基础完工。在安装完海外子结构后,当时俄罗斯最大的钻机将在Arkutun-Dagi油田开始生产石油。该项目的成员埃克森美孚(ExxonMobil)和俄罗斯石油公司(Rosneft)将建立更多此类平台。5月下旬,沃斯托奇尼港口干坞的阿库通-达吉油田(Sakhalin-1项目)的重力基础子结构(GBS)已完成。在滨海边疆区。挪威公司Kvaerner从事基地的设计和建造工作了两年。这个强大的结构是一个160,000吨的矩形,带有四个筒仓,隐约让人联想到“颠倒的大象”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号