首页> 外文期刊>Oilweek >ENGINEERED RESPONSE
【24h】

ENGINEERED RESPONSE

机译:工程响应

获取原文
获取原文并翻译 | 示例
           

摘要

As the Alberta economy shifts into semi-boom mode again, thanks to accelerated oilsands development and unconventional oil and gas expansion, there will have to be more engineers to design the plants and the infrastructure needed to accommodate that growth-and that worries executives with the provincial association that represents engineers. "Alberta's situation is more acute than any other province in Canada," says Len Shrimpton, chief executive officer of the Edmonton-based Association of Professional Engineers, Geologists, and Geophysicists of Alberta (APEGGA), the body responsible for licensing all engineers in the province and for providing ongoing training, as well as working with government, industry and educators to promote the profession. "The expectation is we could be several thousand engineers short in five to 10 years."
机译:随着艾伯塔省经济再次转变为半景气模式,得益于油砂开发的加速和非常规油气的扩张,将必须有更多的工程师来设计工厂和基础设施,以适应这种增长,这使高管感到担忧。代表工程师的省级协会。位于加拿大埃德蒙顿的专业工程师,地质学家和地球物理学家协会(APEGGA)的首席执行官Len Shrimpton说:“艾伯塔省的情况比加拿大任何其他省都更为严重。”省,并提供持续的培训,并与政府,行业和教育工作者合作促进职业发展。 “期望在五到十年内我们可能会短缺数千名工程师。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号