首页> 外文期刊>Oilweek >HEAD OF THE CLASS
【24h】

HEAD OF THE CLASS

机译:班长

获取原文
获取原文并翻译 | 示例
           

摘要

Operations at Christina Lake continue to deliver strong results as production nears capacity just months after the accelerated start up of Phase C in the fall of 2011. Accelerated start-up techniques developed by Cenovus Energy Inc., as the operator of the project, combined with the high quality of the reservoir, have been pegged for the production success achieved to date. As Christina Lake production accelerates, Cenovus is committed to bring future expansion phases on with increasing efficiency.
机译:克里斯蒂娜湖(Christina Lake)的运营在2011年秋季C期加速启动后仅几个月就达到产能,继续取得丰硕成果。Cenovus Energy Inc.作为项目运营商开发的加速启动技术与储油库的高品质与迄今为止取得的生产成功挂钩。随着克里斯蒂娜湖(Christina Lake)生产的加速发展,Cenovus致力于以更高的效率进行未来的扩展阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号