首页> 外文期刊>Oilweek >Enbridge plans for the bitumen barrage
【24h】

Enbridge plans for the bitumen barrage

机译:恩布里奇计划沥青弹幕

获取原文
获取原文并翻译 | 示例
           

摘要

With experts forecasting rising oilsands production over the coming years, a pipeline company has announced major expansion plans to help keep the crude flowing.Enbridge Inc. says it plans to twin its Athabasca pipeline, connecting oilsands projects at Kirby Lake, Alta., to the major oil hub at Hardisty, 345 kilometres south in central Alberta .The $1.2-billion project would add a new 36-inch pipeline along the existing Athabasca right-of-way. Initial capacity would be 450,000 barrels per day, although the company says another 350,000 barrels per day could easily be added with only a minor cost increase.The pipeline is expected to be up and running at full initial capacity by 2016, and not a moment too soon if other oilsands projects continue at their present pace.
机译:据专家预测,未来几年油砂产量将增加,一家管道公司宣布了一项重大扩张计划,以帮助保持原油的流动。EnbridgeInc.表示,它计划将其Athabasca管道加倍,以将阿尔塔州Kirby Lake的油砂项目连接到该油田。位于阿尔伯塔省中部以南345公里的哈迪斯迪(Hardisty)的主要石油枢纽。这项耗资12亿美元的项目将沿现有的阿萨巴斯卡(Athabasca)航路增加一条新的36英寸管道。该公司表示每天可以轻松增加每天350,000桶,而成本仅会增加一点点,初期产能将为每天450,000桶。预计该管道将在2016年建成并以全部初始产能运行,并且不会很快。如果其他油砂项目以目前的速度继续下去,很快。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号