首页> 外文期刊>Oilsands review >First steam achieved at ConocoPhillips Surmont 2, Athabasca Oil Hangingstone
【24h】

First steam achieved at ConocoPhillips Surmont 2, Athabasca Oil Hangingstone

机译:在Athabasca Oil Hangingstone的ConocoPhillips Surmont 2上获得的第一批蒸汽

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Two new SAGD projects are now officially operating, as ConocoPhillips Canada and Athabasca Oil recently achieved first steam at their respective facilities. ConocoPhillips reported the on-schedule start of first steam at Surmont Phase 2 on May 29. The company had expected first steam by mid-year. Production is expected to ramp-up through 2017, adding approximately 118,000 bbls/d of capacity. Total gross capacity for Surmont 1 and 2 is expected to reach 150,000 bbls/d. ConocoPhillips has not reported the project's final cost.
机译:随着加拿大康菲石油公司和阿萨巴斯卡石油公司最近在各自的工厂获得了首批蒸汽,两个新的SAGD项目现已正式运行。康菲石油公司(ConocoPhillips)于5月29日报告了Surmont Phase 2的第一批蒸汽如期开始。该公司原本预计在年中之前开始第一批蒸汽。预计到2017年产量将增加,届时产能将增加约118,000桶/天。 Surmont 1和Surmont 1的总产能预计将达到150,000桶/日。 ConocoPhillips尚未报告该项目的最终成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号