...
首页> 外文期刊>Oilsands review >Syncrude cuts capital cost of mine train replacement to $3.9 billion
【24h】

Syncrude cuts capital cost of mine train replacement to $3.9 billion

机译:Syncrude将更换矿车的资本成本削减至39亿美元

获取原文
获取原文并翻译 | 示例
           

摘要

Partners in Syncrude Canada Ltd. are reducing the projected capital cost of the Mildred Lake mine train replacement by $300 million. Ryan Kubik, president and chief executive officer of majority owner Canadian Oil Sands Limited, says the cut is thanks to the absence of unplanned events during project execution along with better estimates going into it.
机译:Syncrude Canada Ltd.的合作伙伴正在将更换Mildred Lake矿山列车的预计资本成本降低3亿加元。大股东加拿大油砂有限公司总裁兼首席执行官赖安·库比克(Ryan Kubik)表示,裁员是由于在项目执行过程中没有计划外事件,并且对其进行了更好的估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号