首页> 外文期刊>Resources policy >Little by little, inch by inch: Project expansion assessments in the Papua New Guinea mining industry
【24h】

Little by little, inch by inch: Project expansion assessments in the Papua New Guinea mining industry

机译:一点一点,一点一点地:巴布亚新几内亚采矿业的项目扩展评估

获取原文
获取原文并翻译 | 示例
       

摘要

Social impact assessment (SIA) has traditionally been practiced as an ex-ante predictive tool in the context of regulatory approval by government agencies. This model of SIA developed by Burdge and others is based on 'greenfields' development, of a new project going in to areas where there are no, or relatively few, similar types of development. The International Principles of SIA signalled a conceptual shift in the practice of SIA where greater emphasis is placed on the assessment and management of social issues across the life-cycle of developments. In addition forms of cumulative impact assessment have been developed for contexts where more than one project is likely to impact on populations or communities. With these changes to the traditional models of impact assessment there is a need to clarify how and when dedicated phases of 'assessment' might be undertaken over the life-cycle of a development. In the context of the mining industry, SIAs are increasingly required by governments for incremental increases in the size or impact of these operations. This paper reviews the development and application of Project Expansion Assessments (PEAs) for two large-scale mining operations in Papua New Guinea. It argues that a different set of assumptions need to underlie the model of IA for such assessments, with more emphasis on trajectories rather than baselines, a critical evaluation and attribution of effects, and the incorporation of adaptive management tools into the process.
机译:传统上,社会影响评估(SIA)在政府机构的监管批准中被用作事前预测工具。由Burdge和其他人开发的SIA模型是基于“未开发地区”的开发,该新项目正在进入没有或只有很少的类似开发类型的区域。 《 SIA的国际原则》标志着SIA的实践发生了观念上的转变,在此过程中,我们将更多重点放在整个生命周期的社会问题的评估和管理上。另外,已经针对可能有多个项目可能对人口或社区产生影响的情况开发了累积影响评估形式。对传统的影响评估模型进行了这些更改之后,有必要阐明在开发的整个生命周期中如何以及何时进行“评估”的专用阶段。在采矿业的背景下,政府越来越要求SIA扩大这些活动的规模或影响。本文回顾了巴布亚新几内亚的两个大型采矿项目的项目扩展评估(PEA)的开发和应用。它认为,对于此类评估,IA模型需要基于一组不同的假设,其中更多地侧重于轨迹而不是基线,对影响的严格评估和归因,以及将自适应管理工具纳入流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号