...
首页> 外文期刊>Light Metal Age >Norandal Six High Mill Upgrade
【24h】

Norandal Six High Mill Upgrade

机译:诺兰德六高磨坊升级

获取原文
获取原文并翻译 | 示例
           

摘要

In September 2003, Industrial Automation Services (IAS) of Pittsburgh, Pennsylvania, successfully completed a multiphase project for the Norandal six high cold mill in Huntingdon, Tennessee. This project identified opportunities and implemented automation and equipment solutions, which cost-effectively improved the productivity of the mill. This article describes the project scope with specific technical detail on the key elements responsible for productivity improvements. Throughput improvements of 41 percent with increased product quality and yield are discussed. The goal of this project was to achieve sustainable maximum mill design speed and throughput while maintaining acceptable guaranteed gauge and shape performance.
机译:2003年9月,宾夕法尼亚州匹兹堡的工业自动化服务(IAS)成功完成了田纳西州亨廷登市Norandal 6高冷轧机的多阶段项目。该项目发现了机会并实施了自动化和设备解决方案,从而经济高效地提高了工厂的生产率。本文介绍了项目范围,并详细介绍了有助于提高生产率的关键要素的具体技术细节。讨论了通过提高产品质量和产量来提高41%的吞吐量。该项目的目标是实现可持续的最大轧机设计速度和产量,同时保持可接受的有保证的规格和形状性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号