首页> 外文期刊>Lift Report >Mechatronics for lift installers and lift technicians: Asynchronous Gearless Fascination: Modernization In Malaysia/Kuala Lumpur
【24h】

Mechatronics for lift installers and lift technicians: Asynchronous Gearless Fascination: Modernization In Malaysia/Kuala Lumpur

机译:电梯安装人员和电梯技术人员的机电一体化:异步无齿轮迷恋:马来西亚/吉隆坡的现代化

获取原文
获取原文并翻译 | 示例
       

摘要

To coincide with the interlift-Augsburg, in this report we are revisiting the topic of modernization. In this context, we have looked at the operation of brush-type DC gearless hoists in the Liftreport 06/2004 and in other previous issues. Today we are considering the modernization of old asynchronous gearless hoists based on the example of a "KONE" installation with 6-pole gearless motor and typical double wrap. This type of installation exists in places such as Kuala Lumpur, Kuala Lumpur is the capital of Malaysia, has a population of around 1,5 million and is characterized by a large number of extremely high buildings, The best known high-rise buildings in the city, the Petronas Towers also known as the Twin Towers, are illustrated in Fig. 202.
机译:为配合Interlift-Augsburg,在本报告中,我们将重新讨论现代化主题。在这种情况下,我们已经在Liftreport 06/2004和之前的其他期刊中研究了有刷直流无齿轮葫芦的操作。今天,我们正在基于具有六极无齿轮电动机和典型双绕线的“通力”安装示例,考虑对旧的异步无齿轮葫芦进行现代化改造。这种装置存在于诸如吉隆坡之类的地方,吉隆坡是马来西亚的首都,人口约150万,其特点是拥有大量极高的建筑物,是世界上最著名的高层建筑。图202中显示了双子塔,也就是双子塔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号