首页> 外文期刊>Local authority waste & recycling >SITA joins forces with Sembcorp
【24h】

SITA joins forces with Sembcorp

机译:SITA与胜科联手

获取原文
获取原文并翻译 | 示例
           

摘要

Sembcorp UK and SITA UK have announced plans to develop Wilton 11 - an energy recovery facility at the Wilton International site on Teesside. The process will generate 35MW of electricity from an annual feedstock of around 400,000 tonnes of non-hazardous office and household waste. As well as producing green energy, the Sembcorp/SITA facility will also make renewably produced steam and heat available to companies on the Wilton International site. The process will result in an annual saving of 130,000 tonnes of carbon emissions from the site.
机译:英国胜科和英国SITA已宣布计划开发Teton的Wilton国际工厂的能源回收设施Wilton 11。该过程将通过每年约40万吨的非危险办公室和家庭垃圾原料产生35MW的电力。除生产绿色能源外,胜科/ SITA设施还将为Wilton International网站上的公司提供可再生生产的蒸汽和热量。该过程将使该站点每年节省13万吨碳排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号