...
首页> 外文期刊>NGW's Gas Market Reconnaissance >According to Southern California Gas, as of Jul. 15, 18 of the 114 wells at its Aliso Canyon natural gas storage facility have passed state safety and well integrity tests
【24h】

According to Southern California Gas, as of Jul. 15, 18 of the 114 wells at its Aliso Canyon natural gas storage facility have passed state safety and well integrity tests

机译:根据南加州天然气公司的数据,截至7月15日,其Aliso Canyon天然气存储设施中的114口井中有18口通过了国家安全和井完整性测试

获取原文
获取原文并翻译 | 示例

摘要

Of those 18, 15 have received a final approval from the California Division of Oil, Gas and Geothermal Resources. DOGGR established an eight-step check program for the wells after the field was shut down in October after the failure of a now capped and abandoned well. The company said all of its Aliso Canyon wells should pass required state inspections by the end of the summer, allowing a limited refill in advance of the heating season.
机译:在这18家公司中,有15家已获得加州石油,天然气和地热资源司的最终批准。 DOGGR在10月份关闭了已封顶并废弃的井后,关闭了油田,为井建立了八步检查程序。该公司表示,其所有的Aliso Canyon井都应在夏季结束之前通过国家规定的检查,以便在供暖季节开始前进行少量注水。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号