首页> 外文期刊>NGW's Gas Market Reconnaissance >Duke Energy Renewables will build, own and operate the 202-MW Los Vientos II Windpower Project in Willacy County, Texas, approximately 120 miles south of Corpus Christi and 20 miles inland from the Gulf of Mexico.
【24h】

Duke Energy Renewables will build, own and operate the 202-MW Los Vientos II Windpower Project in Willacy County, Texas, approximately 120 miles south of Corpus Christi and 20 miles inland from the Gulf of Mexico.

机译:杜克能源可再生能源公司将在得克萨斯州威拉西县,科珀斯克里斯蒂市以南约120英里,墨西哥湾内陆20英里处建设,拥有和运营202兆瓦的Los Vientos II风力发电项目。

获取原文
获取原文并翻译 | 示例
           

摘要

The company added that it will sell the electricity and renewable energy credits it generates to Austin Energy through a 25-year agreement.
机译:该公司补充说,它将通过一项为期25年的协议将其产生的电力和可再生能源信用出售给Austin Energy。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号