首页> 外文期刊>NGW's Gas Market Reconnaissance >BP is preparing a smaller containment dome to place over one of the leaks at the Deepwater Horizon well, adding that it is being modified at Port Fourchon, Louisiana, and it should be operational by the end of the week.
【24h】

BP is preparing a smaller containment dome to place over one of the leaks at the Deepwater Horizon well, adding that it is being modified at Port Fourchon, Louisiana, and it should be operational by the end of the week.

机译:BP正准备在Deepwater Horizo​​n井中的一个泄漏点上方放置一个较小的密闭圆顶,并补充说,它正在路易斯安那州的Fourchon港口进行了改造,它应在本周末投入使用。

获取原文
获取原文并翻译 | 示例
           

摘要

BP Senior Vice President of Exploration and Production Kent Wells said the new device, called Top Hat, when it is lowered to the leaking well, will be deployed already connected to the riser system.
机译:BP勘探与生产高级副总裁肯特·威尔斯(Kent Wells)表示,这种名为Top Hat的新设备将在下降到泄漏井时部署,该设备已经连接到立管系​​统。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号