首页> 外文期刊>NGW's Gas Market Reconnaissance >The Federal Energy Regulatory Commission has given the OK to TransCanada to hold an open season from Apr. 30 to Jul. 30 for its Alaska Gas Pipeline project.
【24h】

The Federal Energy Regulatory Commission has given the OK to TransCanada to hold an open season from Apr. 30 to Jul. 30 for its Alaska Gas Pipeline project.

机译:联邦能源管理委员会已批准TransCanada为其阿拉斯加天然气管道项目于4月30日至7月30日举行一个开放季节。

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

TransCanada is partnered with Exxon Mobil and the pair have two possible plans for shippers: A $40 billion, 1,700-mile gas pipeline from the North Slope of Alaska to Alberta, where it will interconnect with other lines, and a $26 billion, 800-mile line from the North Slope to Valdez, where a third party would build an LNG export terminal for the gas to be shipped to Pacific markets.
机译:TransCanada与埃克森美孚(Exxon Mobil)合作,双方有两个可能的托运人计划:一条耗资400亿美元,从阿拉斯加北坡到艾伯塔省的1,700英里天然气管道,它将与其他线路互连;以及一条耗资260亿美元的800英里管道从北坡到瓦尔迪兹的输电线路,第三方将在那里建造液化天然气出口码头,以将天然气运往太平洋市场。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号