首页> 外文期刊>NGW's Gas Market Reconnaissance >Cheniere Energy has signed a 20-year tolling agreement with Spanish utility Endesa Generacio for the liquefaction capacity at its planned facility at Corpus Christi, Texas.
【24h】

Cheniere Energy has signed a 20-year tolling agreement with Spanish utility Endesa Generacio for the liquefaction capacity at its planned facility at Corpus Christi, Texas.

机译:Cheniere Energy已与西班牙公用事业公司Endesa Generacio签署了为期20年的收费协议,以提高其在德克萨斯州科珀斯克里斯蒂市计划设施的液化能力。

获取原文
获取原文并翻译 | 示例
       

摘要

The Spanish utility would have the right to buy up to 1.5 million tons per year (205 million cubic feet per day) of supply at the terminal for $3.50/MMBtu plus 115% of the Henry Hub price. The 13.5 million tons/yr (1.85 billion cubic feet per day) project is now second in line in the US Department of Energy queue to allow exports to countries without free trade agreements with the US.
机译:这家西班牙公用事业公司有权每年在码头购买150万吨(每天2.05亿立方英尺)的供应,价格为3.50美元/ MMBtu加Henry Hub价格的115%。这项年产能为1,350万吨/年(每天18.5亿立方英尺)的项目现在在美国能源部的队列中排在第二位,以允许向与美国没有自由贸易协定的国家出口。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号