...
首页> 外文期刊>NGW's Gas Market Reconnaissance >Retired US Coast Guard Adm. Thad Allen said Tuesday that drilling of the relief well to seal BP's Macondo well has been suspended because of a developing weather system in the Gulf of Mexico
【24h】

Retired US Coast Guard Adm. Thad Allen said Tuesday that drilling of the relief well to seal BP's Macondo well has been suspended because of a developing weather system in the Gulf of Mexico

机译:退休的美国海岸警卫队将军Thad Allen周二表示,由于墨西哥湾天气系统的发展,已暂停了钻井以密封BP Macondo井的工作

获取原文
获取原文并翻译 | 示例
           

摘要

Allen said that the relief well is about 30 feet from the Macondo well. The original plan was for the final phase of killing the well to begin by the weekend, but Allen said this would be delayed now by two to three days -- placing the window now from Sunday through Tuesday. The Development Driller III, which is drilling the first of two relief wells, will not leave the scene, Allen said. He explained that work crews will put a storm packer in the casing and remove the drilling string. Once the weather conditions improve, the storm packer will be removed and drilling will resume. The National Hurricane Center reports that the weather system has about a 60% chance of becoming a tropical storm. NHC models have the storm passing over the drilling site at the Mississippi Canyon Block 252 before moving onshore in Louisiana.
机译:艾伦说,救援井距马孔多(Macondo)井约30英尺。最初的计划是在周末之前开始最后一口井的杀灭工作,但是艾伦说,现在这将被推迟两到三天,现在的时间是从星期日到星期二。艾伦说,正在钻探两口救济井中第一口的“发展钻探者III”将不会离开现场。他解释说,工作人员将在套管中放置一个风暴封隔器,并卸下钻柱。天气状况好转后,风暴封隔器将被拆除,钻探将恢复。国家飓风中心报告说,天气系统大约有60%的机会成为热带风暴。 NHC模型的风暴经过密西西比峡谷第252号区块的钻探现场,然后才在路易斯安那州陆上移动。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号