首页> 外文期刊>NGW's Gas Market Reconnaissance >Pacific Gas and Electric is taking steps, as directed by the California Public Utilities Commission, to reduce pressure on four natural gas transmission lines.
【24h】

Pacific Gas and Electric is taking steps, as directed by the California Public Utilities Commission, to reduce pressure on four natural gas transmission lines.

机译:太平洋天然气和电力公司正在按照加利福尼亚公共事业委员会的指示采取措施,以减少四条天然气传输线上的压力。

获取原文
获取原文并翻译 | 示例
           

摘要

PG&E added that the affected lines experienced temporary pressure increases of more than 10% over the maximum allowable operating pressure as established by federal regulations. The lines covered by the order run from Manteca to Modesto, Milpitas to San Jose and Watsonville through Aptos Hills.
机译:PG&E补充说,受影响的管线的临时压力比联邦法规规定的最大允许工作压力增加了10%以上。该订单涉及的生产线从曼特卡(Manteca)到莫德斯托(Modesto),米尔皮塔斯(Milpitas)到圣何塞(San Jose)和沃森维尔(Watsonville)到Aptos Hills。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号