...
首页> 外文期刊>NGW's Gas Market Reconnaissance >BP also has reported that it is bringing a floating production, storage and offloading (FPSO) vessel from the North Sea to handle flow from the well at Mississippi Canyon Block 252.
【24h】

BP also has reported that it is bringing a floating production, storage and offloading (FPSO) vessel from the North Sea to handle flow from the well at Mississippi Canyon Block 252.

机译:BP还报告说,它正从北海引进一艘浮式生产,储存和卸货(FPSO)船,以处理密西西比峡谷第252井的油井流量。

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

BP reports that oil will be processed and stored on the FPSO and then offloaded to a shuttle tanker that will take it to the mainland for refining. For the shuttle tanker, BP has named the Loch Rannoch, a vessel that normally services the Schiehallion development, west of Shetland. The company has not named which FPSO it will use or when it will set sail for the US.
机译:BP报告说,将对石油进行处理并存储在FPSO上,然后将其卸给穿梭油轮,然后将其运往大陆进行提炼。对于穿梭油轮,BP将其命名为Lon Rannoch,这是一艘通常为设得兰群岛以西Schiehallion开发项目服务的船只。该公司尚未透露将使用哪种FPSO或何时启程前往美国。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号