首页> 外文期刊>NGW's Gas Market Reconnaissance >Ronald Sepulvado, a BP well site leader on the Deepwater Horizon, told federal investigators Tuesday crews on the rig knew of leaks on one of two control pods on the blowout preventer as late as early April.
【24h】

Ronald Sepulvado, a BP well site leader on the Deepwater Horizon, told federal investigators Tuesday crews on the rig knew of leaks on one of two control pods on the blowout preventer as late as early April.

机译:英国石油公司深水地平线(Deepwater Horizo​​n)钻井现场负责人罗纳德·塞普尔瓦多(Ronald Sepulvado)周二对联邦调查人员说,钻机上的工作人员知道,防喷器上两个控制吊舱之一的泄漏最迟于4月初。

获取原文
获取原文并翻译 | 示例
       

摘要

He made his comments Tuesday during the investigative hearings by a joint panel of the Coast Guard and Bureau of Ocean Energy Management, Regulation and Enforcement. He said that on Apr. 9, a daily operation report indicated that a control pod was leaking as much as a gallon per minute of hydraulic fluid. He said the problem did not affect the functionality of the BOP.
机译:他在星期二海岸警卫队和海洋能源管理,法规与执法局联合调查听证会上发表了自己的评论。他说,4月9日,一份日常运行报告表明,一个控制箱泄漏的液压油每分钟高达一加仑。他说,这一问题并未影响国际收支平衡表的功能。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号