首页> 外文期刊>NGW's Gas Market Reconnaissance >The National Oil Spill Commission released a statement today that the foam cement Halliburton used to seal BP's Macondo well was unstable and may have contributed to the Apr. 20 blowout
【24h】

The National Oil Spill Commission released a statement today that the foam cement Halliburton used to seal BP's Macondo well was unstable and may have contributed to the Apr. 20 blowout

机译:国家漏油委员会今天发表声明说,用于密封BP Macondo油井的泡沫水泥Halliburton不稳定,可能是4月20日井喷的原因。

获取原文
获取原文并翻译 | 示例
       

摘要

Fred Bartlit, the commission's chief counsel, released the report that also said both Halliburton and BP were aware of flaws in the cement as early as Mar. 8. The panel's report is at odds with statements made by Halliburton officials, under oath, that tests showed the cement mix was stable. In his letter, Bartlit wrote that tests show that "the foam cement used at Macondo was unstable. Halliburton (and perhaps BP) should have considered redesigning the foam slurry before pumping it at the Macondo well."
机译:欧盟委员会首席顾问弗雷德·巴特利特(Fred Bartlit)发表报告,称哈利伯顿公司和英国石油公司早在3月8日就意识到水泥中的缺陷。表明水泥混合料是稳定的。 Bartlit在信中写道,测试表明“ Macondo所用的泡沫水泥是不稳定的。Halliburton(也许是BP)应该在将泡沫泥浆泵送到Macondo井之前考虑重新设计泡沫泥浆。”

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号