...
首页> 外文期刊>NGW's Gas Market Reconnaissance >Crimson Exploration has completed its first operated well in the Bruin Prospect in San Augustine County, Texas
【24h】

Crimson Exploration has completed its first operated well in the Bruin Prospect in San Augustine County, Texas

机译:深红勘探公司在得克萨斯州圣奥古斯丁县的布鲁因勘探区已完成了第一口井的作业

获取原文
获取原文并翻译 | 示例
           

摘要

The Grizzly #1 is producing at a rate of approximately 11.5 million cubic feet per day. In Liberty County, Crimson completed the Schwarz #2, which is now producing at a gross rate of 5.4 MMcf/d.
机译:灰熊#1的日产量约为1150万立方英尺。在自由县,深红完成了Schwarz#2的生产,该公司现在的总生产率为5.4 MMcf / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号