首页> 外文期刊>Land Use Policy >Determinants of cost-effectiveness in tender and offset programmes for Australian biodiversity conservation
【24h】

Determinants of cost-effectiveness in tender and offset programmes for Australian biodiversity conservation

机译:决定澳大利亚生物多样性保护的招标和抵消方案中成本效益的决定因素

获取原文
获取原文并翻译 | 示例
           

摘要

Tender and offset programmes have been broadly applied for biodiversity conservation throughout Australia. This analysis identifies the relative importance of a range of factors that determine the overall cost-effectiveness of these programmes to guide future management, based on the perceptions of survey respondents with experience in their design and implementation. The novel method of maximum entropy regression for categorical response variables is used to analyse survey results. Key actions for tender programmes, in order of decreasing importance, are the: (a) provision of adequate funding, (b) development of flexible tender designs to aid organisational efficiency, (c) promotion of landholder competition, (d) identification of low-cost means ofmonitoring, and (e) establishment of strong relationships with landholders. In comparison, key actions for offset programmes, in decreasing order of importance, are the: (a) establishment of efficient organisational processes, (b) promotion of a short time lag between development and the restoration of ecological values, (c) employment of contracts of extended duration, (d) investment in landholder education and support, and (e) development of appropriate biophysical models.
机译:招标和补偿方案已广泛应用于整个澳大利亚的生物多样性保护。这项分析根据具有设计和实施经验的被调查者的看法,确定了决定这些计划的总体成本效益以指导未来管理的一系列因素的相对重要性。用于分类响应变量的最大熵回归的新方法用于分析调查结果。按重要性递减的顺序,招标计划的关键行动是:(a)提供足够的资金,(b)制定灵活的招标设计以提高组织效率,(c)促进土地所有者竞争,(d)找出低成本的监测手段,以及(e)与土地所有者建立牢固的关系。相比之下,抵消方案的重要性从高到低依次为:(a)建立有效的组织程序;(b)促进发展与恢复生态价值之间的短暂时差;(c)就业延长合同期限;(d)对土地所有者的教育和支持进行投资;(e)开发适当的生物物理模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号