首页> 外文期刊>Landslides >Movement of the Shuping landslide in the first four years after the initial impoundment of the Three Gorges Dam Reservoir, China
【24h】

Movement of the Shuping landslide in the first four years after the initial impoundment of the Three Gorges Dam Reservoir, China

机译:中国三峡大坝水库初次蓄水后的头四年,舒坪滑坡运动

获取原文
获取原文并翻译 | 示例
           

摘要

The Shuping landslide was reactivated by the initial impoundment of the Three Gorges Dam Reservoir, China in June 2003. For purposes of landslide disaster mitigation in the reservoir area and identification of landslide movement and deformation caused by reservoir level changes, a monitoring system mainly consisting of drum-style extensometers was installed in the eastern part of the Shuping landslide. Systematic monitoring was started in August 2004 with installation of 13 extensometers above the waterline after the initial impoundment. In August 2006, 11 more drum-style extensometers were installed above the high waterline (175 m) and Five flexible extensometers were installed along a longitudinal section in the elongation to low waterline. In this paper, the monitoring results from August 2004 to July 2007 are presented and the deforming of the Shuping landslide caused by both reservoir level changes and rainfall is examined.
机译:2003年6月,中国三峡大坝水库初次蓄水,恢复了舒坪滑坡。为缓解库区滑坡灾害,识别水库水位变化引起的滑坡运动和变形,监测系统主要包括以下内容:鼓式引伸计安装在舒坪滑坡的东部。系统监视始于2004年8月,在最初的蓄水之后,在水线上方安装了13个引伸计。 2006年8月,在高水位线(175 m)上方又安装了11个鼓式引伸计,并在延伸至低水位线的纵剖面上安装了5个挠性引伸计。本文介绍了2004年8月至2007年7月的监测结果,并研究了由水库水位变化和降雨引起的树坪滑坡变形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号