...
首页> 外文期刊>NKK技報 >Construction of Bridge for the Trans-Tokyo-Bay Highway
【24h】

Construction of Bridge for the Trans-Tokyo-Bay Highway

机译:跨东京湾高速公路的桥梁建设

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

NKK accepted the order for the construction of superstructure II for the Trans-Tokyo-Bay highway bridge project from the Trans-Tokyo-Bay Highway Corporation in 1992 and completed it in 1995. This highway bridge, the total length of which is 1630 m and the longest span of which is 240 m, is one of the largest girder bridges in Japan. We displayed our manufacturing and constructing techniques successfully through this project. Following this report, we give a summarized description of the design, manufacture, and construction as the characteristics of it.
机译:NKK于1992年接受了跨东京湾高速公路公司的跨东京湾高速公路桥梁项目的上层建筑II的建造订单,并于1995年完成。该公路桥的全长为1630 m,最长跨度为240 m,是日本最大的箱梁桥之一。我们通过该项目成功展示了我们的制造和建造技术。在这份报告之后,我们对设计,制造和构造的特点进行了概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号