【24h】

IN THE SPOTLIGHT

机译:在聚光灯下

获取原文
获取原文并翻译 | 示例
       

摘要

Ore production has commenced ahead of schedule at Xstrata Zinc's A$303m (US$296m) Lady Loretta mine in north-west Queensland, Australia. The early production, which accompanies ongoing development of the underground zinc-lead silver mine, is ahead of the original scheduled start date in mid-2013. Xstrata's decision to develop the upper ore bodies independently of the deeper underground resources will increase annual ore production at Lady Loretta from 1Mt to 1.2Mt. Ore from the mine will go through primary crushing on site before being transported to the Xstrata Zinc Mount Isa complex for processing.
机译:Xstrata Zinc在澳大利亚昆士兰西北部的价值3.03亿澳元(合2.96亿美元)的Lady Loretta矿的矿石生产已提前开始。伴随着地下锌铅银矿的不断开发,该早期生产已提前于2013年中期原定的开始日期进行生产。 Xstrata决定独立于上层地下资源开发上矿体的决定,将使Loretta夫人的年矿石产量从1Mt增加到1.2Mt。矿山中的矿石将在现场进行初步压碎,然后再运至Xstrata锌山伊萨工厂进行加工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号