【24h】

In the Spotlight

机译:在聚光灯下

获取原文
获取原文并翻译 | 示例
       

摘要

Xstrata has announced the commencement of construction of the new Bracemac-McLeod Mine in Quebec, Canada. At full production, the mine will produce 80kt of zinc and 10kt of copper annually, with development tonnes expected in early 2012 ramping up to reach full production in the first quarter of 2013. The total capital cost for the mine is approximately C$158 million (US$151 million), of which Xstrata’s share will be approximately C$104 million (US$98 million). The mine will provide 250 jobs for its life span of at least 4 years and will be located approximately 4 kilometres from Xstrata Zinc’s Matagami concentrator, which is currently supplied with ore from Xstrata Zinc’s nearby Perseverance Mine.
机译:Xstrata宣布在加拿大魁北克开始建造新的Bracemac-McLeod矿。该矿满负荷生产后,每年将生产80kt的锌和10kt的铜,预计2012年初的开发吨数将增加,并于2013年第一季度达到满负荷生产。该矿的总资本成本约为1.58亿加元( 1.51亿美元),其中Xstrata的份额将约为1.04亿加元(9,800万美元)。该矿将提供至少250个工作,使用寿命至少为4年,距离Xstrata Zinc的Matagami选矿厂约4公里,该选矿厂目前由Xstrata Zinc附近的恒心矿提供矿石。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号