...
首页> 外文期刊>Landwards >CE Marking for farm buildings should prevent further collapses
【24h】

CE Marking for farm buildings should prevent further collapses

机译:农用建筑的CE标志应防止进一步倒塌

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

That was the view heard by the seminar audience at the recent Agricultural Buildings Show which took place at the NAC, Stone Leigh. IT's too late to help the owners of the 4,000 farm buildings that collapsed during the past two winters, but forthcoming CE marking for the design and construction of farm buildings will ensure such catastrophes don't happen again.
机译:这就是最近在NAC Stone Leigh举行的农业建筑展览会上,研讨会的听众所听到的观点。 IT来不及帮助在过去两个冬天倒塌的4000栋农舍的所有者,为时已晚,但是即将到来的CE标志(用于农舍的设计和建造)将确保此类灾难不再发生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号