首页> 外文期刊>Nuclear intelligence weekly >Can the CAP1400 Meet SNPTC’s Timeline?
【24h】

Can the CAP1400 Meet SNPTC’s Timeline?

机译:CAP1400能否满足SNPTC的时间表?

获取原文
获取原文并翻译 | 示例
           

摘要

After this month’s apparent breakthrough on the reactor cool- ant pumps (RCPs) designed for China’s first-of-a-kind AP1000s, developers of the CAP1400 design derived from the AP1000 are now eager to see progress at the inaugural CAP1400 project planned for Rongcheng, Shidaowan (Shidao Bay) in Shandong province. Even though the demonstration CAP1400 plant has yet to obtain final approval from China’s State Council, developer State Nuclear Power Technology Corp. (SNPTC) believes the first-of-a-kind project could be connected to the grid by the end of 2019. Industry sources are skeptical, noting the lack of a detailed CAP1400 design.
机译:在本月为中国首创的AP1000设计的反应堆冷却剂泵(RCP)取得明显突破之后,源自AP1000的CAP1400设计的开发人员现在急切地希望在计划中的荣成CAP1400项目中取得进展,山东省石岛湾(石岛湾)。即使示范性CAP1400电厂尚未获得中国国务院的最终批准,开发商国家核电技术公司(SNPTC)相信,首个此类项目可能会在2019年底前并网。消息人士对此表示怀疑,并指出缺少详细的CAP1400设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号