...
首页> 外文期刊>Noise Notes >A handbook on the management of acoustic issues during the building process
【24h】

A handbook on the management of acoustic issues during the building process

机译:关于建筑过程中声学问题管理的手册

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A new handbook has been published by the Swedish National Board of Housing, Building and Planning. This handbook describes the building process from an acoustical point of view. It focuses on the conversion of functional requirements on the performance of the building to appropriate designs of a building. This type of requirement allows all kinds of solutions to be applied, but is also requires coordination of acoustic issues between the parties involved during the entire building process. Hence, the handbook addresses detailed information to each party. Functional requirements and acoustic issues are complex by nature, because they affect many building elements, they are handled by several parties and they must be considered during several phases of the building process. Typical errors come from building designs (floor plans), product designs (input data of elements), calculation models, quality of workmanship (during the construction phase) and uncertainties in field measurements. The aim is to help the commissioner manage the responsibility for these issues. The handbook also covers a large field of practical applications to support the acoustic expertise. It is expected that this handbook will encourage developers and contractors to deal with acoustic issues more efficiently, If the noise environment is not considered in the design process for new residential areas and other building facilities, the satisfaction of tenants, the health costs for the society and the building values will be affected. If verifications are made only at a late stage of the building process, errors are normally discovered too late. They are then expensive to correct for and it is difficult to find out who is responsible. When the verifications are made effectively during the process, costs are minimized.
机译:瑞典国家住房,建筑和规划委员会已出版了新手册。该手册从声学角度描述了建筑过程。它着重于将对建筑物性能的功能要求转换为建筑物的适当设计。这种类型的要求允许应用各种解决方案,但是还需要在整个构建过程中协调相关各方之间的声学​​问题。因此,手册将详细信息发送给每一方。功能需求和声学问题本质上是复杂的,因为它们影响许多建筑元素,由多个部门处理,并且必须在建筑过程的多个阶段中加以考虑。典型的错误来自建筑设计(平面图),产品设计(元素的输入数据),计算模型,工艺质量(在施工阶段)以及现场测量的不确定性。目的是帮助专员管理这些问题的责任。该手册还涵盖了广泛的实际应用领域,以支持声学专业知识。预计该手册将鼓励开发商和承包商更有效地处理声学问题。如果在新居住区和其他建筑设施的设计过程中未考虑噪声环境,房客的满意度以及社会的健康成本建筑价值将受到影响。如果仅在构建过程的后期进行验证,则通常发现错误为时已晚。这样一来,纠正起来的成本很高,而且很难找出谁负责。在此过程中有效地进行验证后,成本将降到最低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号