...
首页> 外文期刊>Non-Ferrous Report >Skorpion Zinc project on track for first shipments early 2003
【24h】

Skorpion Zinc project on track for first shipments early 2003

机译:Skorpion Zinc项目有望于2003年初首次发货

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Global mining giant Anglo American is on track to make initial shipments of zinc from its 454 million dollars Skorpion mine and refinery project in southern Namibia during the early part of 2003, the company said.Anglo American said the facility will ramp up to its output capacity of 150,000 metric tons a year over a two year period, during which time 25 kilogram zinc ingots as well as 1,000 kg and 2,000 kg "jumbo" blocks will be produced. Some zinc is already being produced at the site, but only for training purposes to provide insight into the project plant's hydrometallurgical processes.
机译:该公司表示,全球矿业巨头英美资源集团有望在2003年初从其纳米比亚南部的4.54亿美元Skorpion矿和精炼厂项目中初次装运锌。AngloAmerican表示,该设施将提高产能在两年的时间里,每年将生产15万吨,在此期间,将生产25公斤锌锭以及1,000公斤和2,000公斤“巨型”块。现场已经生产了一些锌,但仅出于培训目的,以提供对项目工厂湿法冶金工艺的了解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号