首页> 外文期刊>New Steel Construction >New Westminster and Chelsea Hospital
【24h】

New Westminster and Chelsea Hospital

机译:新威斯敏斯特和切尔西医院

获取原文
获取原文并翻译 | 示例
           

摘要

A year ago, Graham Wood Structural Limited were appointed to provide the structural steel for the new Westminster and Chelsea Hospital. The contract covered 6,000 tonnes of steelwork plus metal decking and staircases. Graham Wood's erection of the structural steel frame for the hospital is on programme, and completion happily coincided with the Foundation Stone ceremony attended by Secretary of State, Kenneth Clarke, on Wednesday 19th September 1990. The 46 weeks steelwork site programme means that the building of the hospital is on target for the expected 5 year concept-to-completion period, which represents half of that traditionally needed to build a new hospital.
机译:一年前,格雷厄姆木结构有限公司被任命为新的威斯敏斯特和切尔西医院提供结构钢。合同涵盖了6,000吨的钢铁制品以及金属地板和楼梯。格雷厄姆·伍德(Graham Wood)正在为医院架设钢结构框架,这项工程正好在1990年9月19日星期三由国务卿肯尼思·克拉克(Kenneth Clarke)参加的奠基仪式上进行。该医院的预期目标是从概念到完成的5年,这是新建医院所需的传统时间的一半。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号