...
首页> 外文期刊>New steel >The trouble with the EPA/Nucor decision
【24h】

The trouble with the EPA/Nucor decision

机译:EPA / Nucor决定的麻烦

获取原文
获取原文并翻译 | 示例
           

摘要

EPA'S EXPECTED NUCOR enforcement action and the resulting consent decree filed in Dec. 2000 have dominated steel-industry environmental issues over the past year. What caused this predicament, and what impact will it have on the rest of the industry?About two years ago, the U.S. EPA initiated multimedia inspections at Nucor facilities that identified violations at eight Nucor EAF mills and six Vulcraft fabri-cation facilities in seven states (Steel Forum p.40). The complaint culminated with a civil judicial settlement and consent decree announced in Dec. 2000. For 18 months before the consent decree was issued, Nucor worked with the EPA to develop a comprehensive settlement. But the steelmaker felt betrayed by EPA's settlement press release, which emphasized the
机译:在过去的一年中,EPA的预期NUCOR执法行动以及由此产生的同意法令于2000年12月主导了钢铁行业的环境问题。造成这种困境的原因是什么,并将对整个行业产生什么影响?大约两年前,美国EPA在Nucor的工厂启动了多媒体检查,发现了七个州的八个Nucor EAF工厂和六个Vulcraft制造工厂的违规情况。 (钢铁论坛第40页)。该投诉最终以2000年12月宣布的民事司法和解和同意令告终。在发布同意令之前的18个月中,Nucor与EPA合作制定了一项全面解决方案。但是,该钢铁制造商对EPA的和解新闻稿感到出卖,该新闻稿强调了

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号