首页> 外文期刊>Natural Hazards >Landslide dam and subsequent dam-break flood estimation using HEC-RAS model in Northern Pakistan
【24h】

Landslide dam and subsequent dam-break flood estimation using HEC-RAS model in Northern Pakistan

机译:巴基斯坦北部使用HEC-RAS模型的滑坡坝和随后的溃坝洪水估算

获取原文
获取原文并翻译 | 示例
           

摘要

On the morning of January 4, 2010, a massive landslide swept the Attabad and Sarat villages into the Hunza River. The debris from the landslide blocked the low-lying river, creating a barrier lake in the area and poses a major threat to the villages located downstream. The aim of the current study was to evaluate the environmental advantages and disadvantages created by the formation of the artificial lake. For this purpose, Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) data were used to create the contours and triangulated irregular network (TIN) of the region. Data from 'Google Earth' image on March 19, 2010 were used as the reference and to determine the river bed elevation of the study area. Landsat satellite data of Enhanced Thematic Mapper Plus (ETM+) sensor on January 10, March 15, April 24 and May 2, 2010, were used for constructing the Geographic Information System (GIS) layers of the river banks, land use area, overbank flow area and water area estimation. Our results show that the area covered by the water in the lake has increased from 1.28 km2 on January 10, 2010 to 6.25 km2 on May 2, 2010. The total upstream urban area affected by the river blockage is 13.99 km2. We also applied the Hydrologic Engineering Center River Analysis System (HEC-RAS) model to estimate the potential catastrophes due to dam burst for different peak outflow scenarios with conclusions and recommendations.Digital Object Identifier http://dx.doi.org/10.1007/s11069-012-0361-8
机译:2010年1月4日上午,一场巨大的山体滑坡席卷了阿塔巴德(Attabad)和萨拉(Sarat)村庄,进入了罕萨河(Hunza River)。滑坡产生的碎片阻塞了低洼的河流,在该地区形成了一个屏障湖,对下游村庄构成了重大威胁。当前研究的目的是评估人造湖形成对环境的利弊。为此,使用了先进的星载热发射和反射辐射计(ASTER)数据来创建该区域的轮廓和不规则三角网(TIN)。来自2010年3月19日“ Google地球”图像的数据被用作参考,并确定研究区域的河床标高。使用增强主题地图器(ETM +)传感器的Landsat卫星数据(分别于2010年1月10日,3月15日,4月24日和5月2日构建)来构建河岸,土地利用区域,河床超流量的地理信息系统(GIS)层面积和水域面积估算。我们的结果表明,湖中水的覆盖面积已从2010年1月10日的1.28 km2增加到2010年5月2日的6.25 km 2 。受河道堵塞影响的上游市区总面积是13.99 km 2 。我们还应用了水文工程中心河流分析系统(HEC-RAS)模型来估计在不同高峰期流出情况下由于大坝爆裂而引起的潜在灾难,并提供了结论和建议。数字对象标识符http://dx.doi.org/10.1007/ s11069-012-0361-8

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号