首页> 外文期刊>Natural Gas Week. >CCS Projects In Alberta Advancing to Next Stage
【24h】

CCS Projects In Alberta Advancing to Next Stage

机译:CCS项目在艾伯塔省进入下一阶段

获取原文
获取原文并翻译 | 示例
       

摘要

Alberta's carbon capture and sequestration (CCS) ef-forts have take a couple of major steps forward this year as the province has signed agreements with the sponsors of three technologies to be tested in the province aimed at reducing greenhouse gases, primarily carbon dioxide, emitted into the Western Canadian air. The province is injecting almost C$1.2 billion (US$1.22 bil-lion) into the three projects that collectively aim to cut green-house emissions by almost 2.2 million tons per year. The Al-berta government is continuing to pursue letters of intent with other project proponents for the remaining funds available. The first project will be a 145-mile pipeline to collect CO2 emitted from a refinery and a petrochemical plant to be located northeast of the provincial capital of Edmonton, The pipeline, known as the Alberta Carbon Trunk Line, will distribute the CO2 to enhanced oil recovery (EOR) projects in East-Central Alberta's mature oil fields. It also will carry CO2 to sequestration projects in the region.
机译:今年,艾伯塔省的碳捕集与封存(CCS)工作已迈出了重要的一步,因为该省已与三项技术的赞助商签署协议,将在该省进行测试,以减少温室气体(主要是二氧化碳)的排放进入加拿大西部的空气。该省将向这三个旨在每年减少近220万吨温室气体排放的项目注入近12亿加元(12.2亿美元)的资金。艾伯塔省政府将继续与其他项目支持者就剩余可用资金达成意向书。第一个项目将是一条145英里长的管道,用于收集炼油厂和石化厂排放的二氧化碳,该工厂位于埃德蒙顿省省会东北部。该管道被称为艾伯塔省碳干线,将二氧化碳分配给强化石油。中东部艾伯塔省成熟油田的油气回收(EOR)项目。它还将携带二氧化碳到该地区的封存项目中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号