首页> 外文期刊>Natural Gas Week. >Financial, Political Uncertainties Remain for US LNG Export Plans
【24h】

Financial, Political Uncertainties Remain for US LNG Export Plans

机译:美国液化天然气出口计划仍存在财务,政治不确定性

获取原文
获取原文并翻译 | 示例
           

摘要

On the surface, things are going well for Cheniere Energy's US LNG export plans. The company signed a $3.9 billion engineering, procurement and construction (EPC) contract with Bechtel to build two 4.5 million ton per year liquefaction trains at the Sabine Pass receiving terminal on Louisiana's Gulf Coast. And Cheniere also signed a second supply deal for its liquefaction capacity, enough to support construction of the project's first two trains (NGWNov.28'11).
机译:从表面上看,Cheniere Energy的美国LNG出口计划进展顺利。该公司与Bechtel签署了价值39亿美元的工程,采购和建筑(EPC)合同,在路易斯安那州墨西哥湾沿岸的Sabine Pass接收站建造两座每年450万吨的液化火车。 Cheniere还就其液化能力签署了第二份供应协议,足以支持该项目的前两列火车(NGWNov.28'11)的建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号