首页> 外文期刊>Natural Gas Week. >Energia Costa Azul LNG Finishes Testing; First West Coast Terminal
【24h】

Energia Costa Azul LNG Finishes Testing; First West Coast Terminal

机译:Energia Costa Azul LNG完成测试;西海岸第一航站楼

获取原文
获取原文并翻译 | 示例
           

摘要

Sempra LNG has hung the "open for business" sign out in front of its Energia Costa Azul LNG receiving terminal in Baja California after the facility completed its last round of performance tests. The facility is now ready for commercial operations and in doing so, becomes the first LNG receipt facility on the West Coast of North America, said Sempra LNG Chief Executive Darcel L. Hulse. Located 14 miles north of Ensenada, the 800 million terminal is fully contracted and capable of processing up to 1 billion cubic feet of natural gas per day.
机译:该工厂完成了最后一轮性能测试后,Sempra LNG在其位于美国加利福尼亚州下加利福尼亚州的Energia Costa Azul LNG接收站前悬挂了“营业”标志。 Sempra LNG首席执行官Darcel L. Hulse说,该设施现已准备就绪,可用于商业运营,并成为北美西海岸的第一家LNG接收设施。位于恩塞纳达(Ensenada)以北14英里处的8亿个终端已完全签约,每天可处理多达10亿立方英尺的天然气。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号