首页> 外文期刊>Natural Gas Week. >Macondo Trial Enters 6th Week; BP Ignored Halliburton Warnings
【24h】

Macondo Trial Enters 6th Week; BP Ignored Halliburton Warnings

机译:Macondo试用进入第6周; BP忽略哈利伯顿警告

获取原文
获取原文并翻译 | 示例
           

摘要

The pace of the Macondo trial has shifted from a constant barrage of finger pointing to testimony now aimed at deflecting and contradicting earlier witnesses on everything from the safety of drilling rig to crew training. As the non-jury trial entered its sixth week, two key issues continue to be brought up: safety and the unexpected appearance of Halliburton cement samples that had been missing for three years and may be associated with the Macondo well. Late last week, Nathaniel Chaisson, Halliburton's cementing services coordinator, told the court he recommended to BP that 21 stabilizers be used to center the drill pipe in the well. Chaisson said that four days before the blowout, a BP official told him the decision was made to go with just six stabilizers.
机译:Macondo审判的步伐已从指尖不断的指责转变为如今的证词,目的是在从钻机安全到船员培训的所有事情上偏离和矛盾早期的证人。随着非陪审团审判进入第六周,两个关键问题继续出现:安全性和哈里伯顿水泥样品的意外出现,这些样品已经缺失了三年,可能与Macondo油井有关。上周晚些时候,哈利伯顿固井服务协调员纳撒尼尔·蔡森(Nathaniel Chaisson)告诉法院,他向英国石油公司建议使用21种稳定剂将钻杆置于井中。 Chaisson说,井喷发生前四天,一名BP官员告诉他,决定只使用6个稳定器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号