...
首页> 外文期刊>Natural gas intelligence >Rockies Express Gets FERC Approval For East-to-West Capacity Expansion
【24h】

Rockies Express Gets FERC Approval For East-to-West Capacity Expansion

机译:落基山脉快车获得FERC的东西方产能扩展批准

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Tallgrass Energy Partners LP said Monday that FERC has approved its Zone 3 East-to-West Project that would modify the Rockies Express Pipeline (REX) to send an additional 1.2 Bcf/d of Appalachian natural gas to Midwest markets. REX is now waiting for the Federal Energy Regulatory Commission (FERC) to issue a final Notice to Proceed, and the project is expected to be in service in the second half of the year. The pipeline’s Seneca Lateral, which delivers 600 MMcf/d from MarkWest Energy Partners LP’s Seneca gas processing plant in Noble County, OH, to the Rex mainline and westward through Ohio, Indiana and Illinois is already in service (see Shale Daily, June 18, 2014). Tallgrass, which operates and owns half the pipeline along with Sempra U.S. Gas & Power (25%) and Phillips 66 (25%,) said Monday that the lateral has reached full capacity.
机译:Tallgrass Energy Partners LP周一表示,FERC已批准其3区东西方项目,该项目将修改落基山脉快运管道(REX),以向中西部市场额外输送1.2 Bcf / d的阿巴拉契亚天然气。 REX现在正在等待联邦能源管理委员会(FERC)发布继续进行的最终通知,该项目有望在下半年投入使用。管道的Seneca侧向输送能力为600 MMcf / d,从MarkWest Energy Partners LP位于俄亥俄州Noble County的Seneca天然气加工厂到Rex干线,并通过俄亥俄州,印第安纳州和伊利诺伊州向西输送(参见Shale Daily,6月18日, 2014)。塔尔格拉斯(Tallgrass)运营并拥有一半的管道,同时拥有Sempra美国天然气与电力公司(25%)和菲利普斯66(25%)的股份,该分支机构已达到满负荷生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号