首页> 外文期刊>Metal Forming >Quick-Die-Change Strategy Q&Awith an Expert
【24h】

Quick-Die-Change Strategy Q&Awith an Expert

机译:快速换模策略与专家问答

获取原文
获取原文并翻译 | 示例
       

摘要

Standardize-your dies, processes and QDC equipment-is the common rallying cry heard as metalformers seek to optimize their return on investment when purchasing clamps, bolster extensions, die carts and other products. Here's a sign you'll likely not find in a press shop: FOUND - EXTRA PRESS TIME Instead, at the end of a shift you're more likely to wonder why actual production failed to match what was scheduled. And while the causes of this dilemma can be many, a likely one is overly time-consuming die changes. They can occur for any number of reasons - lack of forklift availability, manpower shortages and missing/hiding tools, for example.
机译:标准化您的模具,工艺和QDC设备-是金属成型者在购买夹具,支撑扩展,模具车和其他产品时寻求优化其投资回报的普遍呼声。这是您在印刷厂中可能找不到的标志:查找-额外印刷时间相反,在轮班结束时,您更有可能想知道为什么实际生产未能达到预定的水平。尽管造成这种困境的原因可能很多,但很可能是更换模具过于费时。发生这种情况的原因有很多-例如,缺乏叉车可用性,人力短缺和缺少/隐藏工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号