...
首页> 外文期刊>Nefte Compass >Transneft Completes Espo-2 Construction
【24h】

Transneft Completes Espo-2 Construction

机译:Transneft完成Espo-2建设

获取原文
获取原文并翻译 | 示例

摘要

Russian pipeline monopoly Transneft announced on Sep. 10 the comple- tion of line work for the second phase of the strategic East Siberia–Pacific Ocean (Espo) crude oil pipeline de- signed to diversify Russian exports into Asia-Pacific markets. Transneft said the "golden joint" of the Espo-2 line, running from Skovorodino, the endpoint of Espo's first phase, to the Pacific port of Kozmino, was welded in the Primorsk region. Transneft now has to finish testing the pumping sta- tions along the route and fine-tune the work of other surface facilities.
机译:俄罗斯管道垄断企业Transneft于9月10日宣布,战略西伯利亚-太平洋(Espo)战略原油管道第二阶段的管道工程完工,旨在使俄罗斯向亚太市场的出口多样化。 Transneft说,Espo-2生产线的“黄金接头”从埃斯波一期工程的终点斯科沃罗迪诺延伸到太平洋港口的科兹米诺,已焊接在滨海边疆区。现在,Transneft必须完成对沿途抽水站的测试,并对其他地面设施的工作进行微调。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号