首页> 外文期刊>Nefte Compass >Tethys Closes In on Uzbek Fields
【24h】

Tethys Closes In on Uzbek Fields

机译:特提斯(Tethys)在乌兹别克斯坦田野上关闭

获取原文
获取原文并翻译 | 示例
           

摘要

Central Asian explorer Tethys Petroleum has signed a memoran- dum of understanding with Uzbekistan's Uzbekneftegaz with a view to obtaining two further pro- duction-enhancement contracts (PECs) in the country, some 14 months after the two firms agreed to study the idea (NC Sep.9'10). London- and Toronto-listed Tethys has until May 1, 2012 to negotiate contracts for the Chegara group of oil fields and the West Kruk oil field, both of which are in proximity to the North Urtabulak field that Tethys currently operates under a PEC. "The Chegara group of fields is less developed than North Urtabulak and Tethys believes that these fields give significant potential for additional oil pro- duction in the short term," the company said.
机译:中亚勘探公司Tethys石油公司已与乌兹别克斯坦的乌兹别克石油公司签署了谅解备忘录,以期在该国获得两个进一步的生产增强合同(PEC),这是两家公司同意研究该想法的14个月后(NC 2010年9月9日)。在伦敦和多伦多上市的特提斯公司必须在2012年5月1日之前就Chegara油田和西克鲁克油田的合同进行谈判,这两个地区都靠近特提斯目前根据PEC运营的北乌塔布拉克油田。该公司表示:“ Chegara组的油田不及North Urtabulak油田开发,而Tethys认为,这些油田在短期内具有很大的潜力,可以额外生产石油。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号